1. ZT310T-M main bracket(hight-seat)
|
|
|
|
|
|
|
|
2. B3-03 main bracket cushion rubber(after-sale)
|
|
|
|
|
|
|
|
3. HJ125-6 main bracket double spring (E-mark)
|
|
|
|
|
|
|
|
4. ZT310T-M main bracket shaft
|
|
|
|
|
|
|
Quantity
|
|
|
1
|
|
Note: φ10×206 + φ16×2mm, the cotter pin hole diameter of the old model is 2mm, which is paired with GB91φ2×15; the new model is 3mm, which is paired with GB91φ3×16. If you need to replace this main support shaft, it is recommended to purchase one GB91φ3×16. The cotter pin hole diameter will probably be switched to 3mm starting from April 4, 2026.
|
|
|
|
5. GB97.1 φ10(white Zinc)
|
|
|
|
|
|
|
|
6. GB91 φ2×15 (environmental color)(5 pcs/after-sale)
|
|
|
|
|
|
|
Quantity
|
|
|
1
|
|
Note: Since the parts are small and for the convenience of packaging and shipping, these parts are required to be sold in packs/bags/boxes of 5 pieces each, i.e., one material code already includes 5 such parts. The quantity assembled in the assembly only represents the actual usage of this part within the current assembly (not calculated as 5 times), so please be sure to pay attention to the quantity (assembly quantity × 5) when placing an order to avoid over-purchasing. For example, the assembly quantity of ZT250 - S expansion nails (5 pieces/set - after-sales) in the assembly is 2, and the quantity after adding to the shopping cart is 2; the actual quantity received will be 10 (5 × 2 = 10) pieces of ZT250 - S expansion nails, and so on.
|
|
|
|
7. GB91 φ3×16 (environmental color)
|
|
|
|
|
|
|
|
8. ZT1P58MJ main bracket reset spring column(5 pcs/after-sale)
|
|
|
|
|
|
|
Quantity
|
|
|
1
|
|
Note: Since the parts are small and for the convenience of packaging and shipping, these parts are required to be sold in packs/bags/boxes of 5 pieces each, i.e., one material code already includes 5 such parts. The quantity assembled in the assembly only represents the actual usage of this part within the current assembly (not calculated as 5 times), so please be sure to pay attention to the quantity (assembly quantity × 5) when placing an order to avoid over-purchasing. For example, the assembly quantity of ZT250 - S expansion nails (5 pieces/set - after-sales) in the assembly is 2, and the quantity after adding to the shopping cart is 2; the actual quantity received will be 10 (5 × 2 = 10) pieces of ZT250 - S expansion nails, and so on.
|
|
|
|